The New Norfolk Fire Station Project
Dore & Whittier Architects reached out to us for a solution for their cladding attachment system for their new Norfolk Fire Station project. They were so satisfied with our solution that they requested and received permission to list our Stand-Off MPV Bracket proprietarily in the specifications. Castagna Construction was the low General Contractor bidder in the project and awarded the siding work to Sean Sullivan’s company Pioneer Wall Systems, LLC. We worked with Sean and his people on designing and installing the cladding attachment systems, and all parties involved were pleased with the results.
EXO-TEC’S Northeast 2024 Project
Project
Architect
General Contractor
Siding Contractor
Solution
Dore & Whittier Architects selected our Stand-Off MPV Bracket for their cladding support system on the new Norfolk Fire Station.
Gen3 Construction selected our Stand-Off MPV Bracket for their cladding support system on the NREL Flatirons Control Facility.
The NREL Control Center Facility will accommodate future research requirements and will be the first phase of a much larger research facility. It will be the monitoring and operational control of on-site integrated energy systems while additionally interfacing with other national labs, universities, and research institutions worldwide.
EXO-TEC’S Midwest 2024 Project
Project
Architect
Developer
National Renewable Energy Laboratory
Construction Manager
Cladding Contractor
Solution
Gen3 Construction selected our Stand-Off MPV Bracket for their cladding support system on the NREL Flatirons Control Facility.
Optimum Building Systems used our Stand-Off MPV Bracket on 105 Washington Street, Brighton, MA for fastening the ACM veneer to the building.
EXO-TEC’S Northeast 2024 Project
Project
105 Washington Street
Brighton, MA
Architect
RODE Architects
Boston, MA
Developer
Brookline Development Corporation
General Contractor
Prominent Builders
Metal Panel Contractor
Optimum Building Systems
Solution
Our Stand-Off MPV Bracket was used on the 105 Washington Street project in Brighton, MA for the attachment of the ACM panel veneer.
Why are no insulation fasteners needed for our Stand-Off MPV Bracket?
Ultimate Construction, LLC used our Stand-Off MPV Bracket on the addition to the Homer Babbidge Library at the University of Connecticut in Storrs, CT. They have used our brackets on several projects now with great success.
For this project, they used our stainless steel version for 4” thick insulation. The insulation is mineral wool. No fasteners were needed for the mineral wool as our bracket fastens the insulation resulting in no insulation fasteners penetrating the air and water barrier membrane. Also, Ultimate Construction, LLC did not have to buy or install insulation fasteners resulting in savings to them.
EXO-TEC’S Northeast 2020 Project
Project
Homer Babbidge Library
Storrs, CT
Architect
DesignLAB Architects
Boston, MA
General Contractor
Downes Construction Company
New Britain, CT
Siding Contractor
Ultimate Construction, LLC
Southington, CT
Solution
Our stainless Steel Stand-Off MPV Bracket for 4” thick mineral wool insulation.
.
Using our Stand-Off MPV Bracket to attach fiber cement siding
The Kademah-Torah Moshe Synagogue used our Stand-Off MPV Bracket for the attachment of the fiber cement siding used on the building.
EXO-TEC’S Northeast 2020 Project
Project
Congregation Kademah-Torah Moshe Synagogue
Brighton, MA
Architect
RODE Architects
Boston, MA
General Contractor
Brookline Development Corporation
Boston, MA
Solution
Our zinc and yellow chromate plated Stand-Off MPV Bracket for 2” thick mineral wool insulation.
How Do You Attach Your Rainscreen Panel Veneer To Your Building?
On the Morse High School in Bath, ME they are using our Stand-Off MPV Brackets and hat-furring. Why?
Lowest material cost.
Lowest installation cost.
The bracket provides for the mechanical fastening of the cavity insulation. This is Facades, Inc. first project using the bracket. They have just started installation. We will get back to you with their progress and assessment of the bracket.
EXO-TEC’S Northeast 2020 Project
Project
Morse High School
Bath, ME
Architect
Lavallee Brensinger Architects
Manchester, NH
General Contractor
Harvey Construction
Bedford, NH
Metal Panel Veneer Contractor
Facades, Inc.
Hampstead, NH
Solution
Stand-Off MPV Bracket for 4” insulation, zinc and yellow chromate plated.
After their successful first use of our Stand-Off MPV Bracket, Ultimate Construction, LLC submitted it for use on the Henry James Middle School in Simsbury, CT. The Architect, Kaestle Boos Associates, Inc. and their independent specification consultant, Traci Hillebrecht of Architx, LLC, approved the use of the bracket.
What are the benefits of using the bracket?
- Ultimate Construction, LLC saved money on the purchasing of the metal panel attachment system.
- Ultimate saved money on the labor to install the system.
- The project had about 2,300 less screw penetrations through the air, water and vapor barrier.
- Ultimate did not have to purchase the fasteners for the insulation or install them because the bracket has its own mechanical insulation fastening mechanism.
EXO-TEC’S Northeast 2019 Best Projects
Project
Henry James Middle School
Simsbury, CT
Architect
Kaestle Boos Associates, Inc.
New Britain, CT
General Contractor
Ultimate Construction, LLC.
Southington, CT
Specifications Consultant
Traci Hillebrecht of Architx, LLC,
Stafford Springs, CT
Metal Panel Veneer Contractor
Ultimate Construction, LLC
Southington, CT
Solution
Stand-Off MPV Bracket for 4” insulation, zinc and yellow chromate plated.
Why use the Stand-Off MPV Bracket?
When Ultimate Construction, LLC was awarded the metal panel veneer work on the Kaiser Hall Addition at Central Connecticut State University they took pricing for the metal panel veneer attachment system from the several manufacturers that were listed in the specifications. While we usually sell only the brackets, Ultimate asked us to also price the hat-furring, z-furring, fasteners and engineering needed for the fastening system. We were 20% less than our nearest competitor.
On top of that, we pointed out to Ultimate that if they chose our system, they did not need to purchase insulation fasteners or pay for the labor to install them since our system was the only one that provided mechanical fastening of the insulation. They came to the conclusion that using our system was their best choice for the project. The project is progressing nicely and they have submitted our bracket on a few other projects that they have been awarded due to the satisfaction with our system.
Give us a try. You won’t be disappointed!
EXO-TEC’S Northeast 2019 Best Projects
Project
Central Connecticut State University
Kaiser Hall Addition
New Britain, CT
Architect
Sasaki Associates
Watertown, MA
General Contractor
Lawrence Brunoli, Inc.
Farmington, CT
Specifications Consultant
Kalin Associates
Newton, MA
Metal Panel Veneer Contractor
Ultimate Construction, LLC
Lewiston, ME
Solution
Stand-Off MPV Bracket for 4” insulation, zinc and yellow chromate plated.
EXO-TEC’S Northeast 2018 Best Projects
Project
Mid-Coast School of Technology
Rockland, ME
Architect
Levallee Brensinger Architects
Manchester, NH
General Contractor
Sheridan Construction
Portland, ME
Metal Panel Veneer Contractor
Industrial Roofing Companies
Lewiston, ME
Solution
Stand-Off MPV Bracket for 4” insulation, zinc and yellow chromate plated.
Project
Daughters Of Isreal Mikvah
Brighton, MA
Architect
RODE Architects, Inc.
Boston, MA
General Contractor
Kalplan Construction
Brookline, MA
Solution
Stand-Off MPV Bracket for 4” insulation, zinc and yellow chromate plated.