EXO-TEC Projects

 

The New Norfolk Fire Station Project

 

Dore & Whittier Architects reached out to us for a solution for their cladding attachment system for their new Norfolk Fire Station project. They were so satisfied with our solution that they requested and received permission to list our Stand-Off MPV Bracket proprietarily in the specifications. Castagna Construction was the low General Contractor bidder in the project and awarded the siding work to Sean Sullivan’s company Pioneer Wall Systems, LLC. We worked with Sean and his people on designing and installing the cladding attachment systems, and all parties involved were pleased with the results.

EXO-TEC’S Northeast 2024 Project

Project

Norfolk’s New Fire Station
Norfolk, MA
 

Architect

Dore & Whittier
Newburyport, MA


General Contractor 

Castagna Construction
Danvers, MA
 

Siding Contractor

Pioneer Wall Systems, LLC
New Boston, NH


Solution

Dore & Whittier Architects selected our Stand-Off MPV Bracket for their cladding support system on the new Norfolk Fire Station.

Gen3 Construction selected our Stand-Off MPV Bracket for their cladding support system on the NREL Flatirons Control Facility.

 

The NREL Control Center Facility will accommodate future research requirements and will be the first phase of a much larger research facility. It will be the monitoring and operational control of on-site integrated energy systems while additionally interfacing with other national labs, universities, and research institutions worldwide.

EXO-TEC’S Midwest 2024 Project

Project

NREL Flatirons Control Facility
Arvada, CO
 

Architect

HDR Architects
1670 Broadway, Suite 3400
Denver, CO


Developer

National Renewable Energy Laboratory

Construction Manager

Mortensen Construction
1621 18th St Ste 400
Denver, CO 


Cladding Contractor

Gen3 Construction
2880 S Raritan Street
Englewood, CO 


Solution

Gen3 Construction selected our Stand-Off MPV Bracket for their cladding support system on the NREL Flatirons Control Facility.

Optimum Building Systems used our Stand-Off MPV Bracket on 105 Washington Street, Brighton, MA for fastening the ACM veneer to the building.

 

EXO-TEC’S Northeast 2024 Project

Project

105 Washington Street
Brighton, MA

Architect

RODE Architects
Boston, MA

Developer

Brookline Development Corporation

General Contractor

Prominent Builders

Metal Panel Contractor

Optimum Building Systems

Solution

Our Stand-Off MPV Bracket was used on the 105 Washington Street project in Brighton, MA for the attachment of the ACM panel veneer.

Why are no insulation fasteners needed for our Stand-Off MPV Bracket?

Ultimate Construction, LLC used our Stand-Off MPV Bracket on the addition to the Homer Babbidge Library at the University of Connecticut in Storrs, CT. They have used our brackets on several projects now with great success.

For this project, they used our stainless steel version for 4” thick insulation. The insulation is mineral wool. No fasteners were needed for the mineral wool as our bracket fastens the insulation resulting in no insulation fasteners penetrating the air and water barrier membrane. Also, Ultimate Construction, LLC did not have to buy or install insulation fasteners resulting in savings to them.

EXO-TEC’S Northeast 2020 Project

Project

Homer Babbidge Library
Storrs, CT

Architect

DesignLAB Architects
Boston, MA

General Contractor

Downes Construction Company
New Britain, CT

Siding Contractor

Ultimate Construction, LLC
Southington, CT

Solution

Our stainless Steel Stand-Off MPV Bracket for 4” thick mineral wool insulation.

.

Using our Stand-Off MPV Bracket to attach fiber cement siding

The Kademah-Torah Moshe Synagogue used our Stand-Off MPV Bracket for the attachment of the fiber cement siding used on the building.

EXO-TEC’S Northeast 2020 Project

Project

Congregation Kademah-Torah Moshe Synagogue
Brighton, MA

Architect

RODE Architects
Boston, MA

General Contractor

Brookline Development Corporation
Boston, MA

Solution

Our zinc and yellow chromate plated Stand-Off MPV Bracket for 2” thick mineral wool insulation.

How Do You Attach Your Rainscreen Panel Veneer To Your Building?

On the Morse High School in Bath, ME they are using our Stand-Off MPV Brackets and hat-furring. Why?

Lowest material cost.
Lowest installation cost.

The bracket provides for the mechanical fastening of the cavity insulation. This is Facades, Inc. first project using the bracket. They have just started installation. We will get back to you with their progress and assessment of the bracket.

EXO-TEC’S Northeast 2020 Project

Project

Morse High School
Bath, ME

Architect

Lavallee Brensinger Architects
Manchester, NH

General Contractor

Harvey Construction
Bedford, NH

Metal Panel Veneer Contractor

Facades, Inc.
Hampstead, NH

Solution

Stand-Off MPV Bracket for 4” insulation, zinc and yellow chromate plated.

After their successful first use of our Stand-Off MPV Bracket, Ultimate Construction, LLC submitted it for use on the Henry James Middle School in Simsbury, CT. The Architect, Kaestle Boos Associates, Inc. and their independent specification consultant, Traci Hillebrecht of Architx, LLC, approved the use of the bracket.

What are the benefits of using the bracket?

  • Ultimate Construction, LLC saved money on the purchasing of the metal panel attachment system.
  • Ultimate saved money on the labor to install the system.
  • The project had about 2,300 less screw penetrations through the air, water and vapor barrier.
  • Ultimate did not have to purchase the fasteners for the insulation or install them because the bracket has its own mechanical insulation fastening mechanism.

EXO-TEC’S Northeast 2019 Best Projects

Project

Henry James Middle School
Simsbury, CT

Architect

Kaestle Boos Associates, Inc.
New Britain, CT

General Contractor

Ultimate Construction, LLC.
Southington, CT

Specifications Consultant

Traci Hillebrecht of Architx, LLC,
Stafford Springs, CT

Metal Panel Veneer Contractor

Ultimate Construction, LLC
Southington, CT

Solution

Stand-Off MPV Bracket for 4” insulation, zinc and yellow chromate plated.

Why use the Stand-Off MPV Bracket?

When Ultimate Construction, LLC was awarded the metal panel veneer work on the Kaiser Hall Addition at Central Connecticut State University they took pricing for the metal panel veneer attachment system from the several manufacturers that were listed in the specifications. While we usually sell only the brackets, Ultimate asked us to also price the hat-furring, z-furring, fasteners and engineering needed for the fastening system. We were 20% less than our nearest competitor.

On top of that, we pointed out to Ultimate that if they chose our system, they did not need to purchase insulation fasteners or pay for the labor to install them since our system was the only one that provided mechanical fastening of the insulation. They came to the conclusion that using our system was their best choice for the project. The project is progressing nicely and they have submitted our bracket on a few other projects that they have been awarded due to the satisfaction with our system.

Give us a try. You won’t be disappointed!

EXO-TEC’S Northeast 2019 Best Projects

Project

Central Connecticut State University
Kaiser Hall Addition
New Britain, CT

Architect

Sasaki Associates
Watertown, MA

General Contractor

Lawrence Brunoli, Inc.
Farmington, CT

Specifications Consultant

Kalin Associates
Newton, MA

Metal Panel Veneer Contractor

Ultimate Construction, LLC
Lewiston, ME

Solution

Stand-Off MPV Bracket for 4” insulation, zinc and yellow chromate plated.

Mid-Coast Tech School of Technology Project, Rockland ME

EXO-TEC’S Northeast 2018 Best Projects

Project

Mid-Coast School of Technology
Rockland, ME

Architect

Levallee Brensinger Architects
Manchester, NH

General Contractor

Sheridan Construction
Portland, ME

Metal Panel Veneer Contractor

Industrial Roofing Companies
Lewiston, ME

Solution

Stand-Off MPV Bracket for 4” insulation, zinc and yellow chromate plated.

Daughters of Israel Mikvah Building, Brighton, MA

Project

Daughters Of Isreal Mikvah
Brighton, MA

Architect

RODE Architects, Inc.
Boston, MA

General Contractor

Kalplan Construction
Brookline, MA

Solution

Stand-Off MPV Bracket for 4” insulation, zinc and yellow chromate plated.

Build Leak-Proof Buildings with EXO-TEC.

Subscribe To Our Newsletter

Successfully helping Architects, Builders, and Contractors Build Leak-Proof Buildings throughout the USA for over 30 years.

You have Successfully Subscribed!

Share This